Construction Cost Estimator

Estimate total construction cost, material quantities, component-wise expenditure and additional project costs.

TCC Engineering
Estimation Mode
Choose a quick project estimate or detailed cost analysis.
Project Details
%
Use positive or negative adjustment if local rates vary.
₹ / sq.ft
Editable according to current local construction rates.
Floor-wise Built-up Area 1 Floor
# Floor Built-up Area Multiplier Effective Area Action
1
sq.ft
×
1,000.00 sq.ft
Total Built-up Area
1,000.00 sq.ft
92.90 sq.m
Approximate Material Requirement
Material quantities below are preliminary planning estimates based on editable consumption factors. Actual quantities shall depend on structural design, architectural configuration, specifications and site conditions.
Material Consumption Factor Quantity Rate Amount
Cement
Bags
bag/sq.ft
0 bags
₹ /bag
₹0
Reinforcement Steel
kg
kg/sq.ft
0 kg
₹ /kg
₹0
Sand
cu.ft
cft/sq.ft
0 cft
₹ /cft
₹0
Coarse Aggregate
cu.ft
cft/sq.ft
0 cft
₹ /cft
₹0
Bricks
Nos.
nos/sq.ft
0 nos
₹ /no
₹0
Approximate Material Cost ₹0
Additional / External Works
No additional works added
Add compound wall, lift, sump, borewell, solar system, landscaping or any other project cost.
Project Allowances
%
%
%
Keep 0 if not applicable.